Basic activity:
- Performance of design ,survey ,construction and installation works for buildings and structures of I and II levels of responsibility and carrying out of engineering researches for these purposes.
- Design, construction and installation of power transmission lines of 0,4-110 kV in aerial, cable and aerial-cable execution, transformer substations of 10/0,4kV-35-110/10 kV
- Development of sections of project documentation: master plan and transport; * construction solutions; * engineering equipment, networks and systems of heat, water, sewerage, heating and ventilation, power supply, electrical equipment and electric lighting; * technological solutions (design of electrical facilities and enterprises for the production of building materials).
- Construction and other special installation works: excavation and special works in the ground (punctures), performed mechanized, with the installation of foundations and foundations and the laying of communications; * work on the construction of stone structures; * work on assembling prefabricated concrete and reinforced concrete structures; * work on installation and installation of load-bearing wooden structures; * roofing; * Waterproofing works; Electrical work (installation of networks and power supply systems, electric lighting).